Subject of the contract: |
Production of steel structure “Wasserturm” |
Location: |
France, FR |
The period of execution of the works: |
2008 – 2009 |
Subject of the contract: |
Production of steel structure “Wasserturm” |
Location: |
France, FR |
The period of execution of the works: |
2008 – 2009 |