/Bridge across the Torysa river/
Subject of the contract: |
Production and assembly of the steel structure of the bridge weighing 1.018 tons and 163,42m long. The bridge consists of two separate load-bearing structures, one for each traffic direction. The supporting structure is designed as a continuous reinforced concrete composite structure with three bays. It consists of a pair of steel solid beams, support crossbeams and pole lattice crossbeams. On the outer and inner supports, the structure is always mounted on a pair of bearings located under the mains beams. |
Location: |
Prešov, SK |
The period of the execution of the works: |
2016–2017 |