Subject of the contract: |
Production and assembly of the steel structure of the bridge Description: The bridge structure SO 209 is an important part of the final construction section D1 0136 Říkovice – Přerov of the new D1 motorway on the route from Vyškov to Lipník nad Bečvou. The structure consists of two parallel bridges, the left bridge in the direction Ostrava – Brno and the right bridge in the direction Brno – Ostrava. The total width of the superstructure is 17.70 m (LM) and 15.55 m (PM) respectively. The main superstructure of the bridge consists of two separately stamped steel-concrete double-beam structures of 20 spans with an upper bridge deck, founded on common deep foundations. Statically, the two superstructures form longitudinally one continuous beam. |
Location: |
Přerov, CZ |
The period of the execution of the works: |
2023 |