City Arena Trnava – Anton Malatinsky Stadium

Subject of the contract:
Production and assembly of the steel structure of the roof of the southern, eastern and northern stands of the stadium.
Location:
Trnava, SK
The period of execution of the works:
2014 – 2015
04022015(012)
04022015(014)
08072014(031)
09022015(001)
a2
05062014(005)
3
11032015
20012015(029)
09122014(011)
03022015(016)
24042015(012)
04022015(012) 04022015(014) 08072014(031) 09022015(001) a2 05062014(005) 3 11032015 20012015(029) 09122014(011) 03022015(016) 24042015(012)