logistic plant seoyon e-hwa automotive

Subject of the contract:
Production and assembly of the steel structure of the hall
Location:
Čadca
The period of execution of the works:
2018
IMG_20180724_145301
IMG_20180724_095606
IMG_20180720_095304
IMG_20180724_145536
IMG_3532
IMG_20181001_125050
IMG_3576
SEOYON_2-500x500
IMG_20180724_145301 IMG_20180724_095606 IMG_20180720_095304 IMG_20180724_145536 IMG_3532 IMG_20181001_125050 IMG_3576 SEOYON_2-500x500