Steel construction of the tower crown

Subject of the contract:
Production and assembly of the steel structure of the tower crown for the event “EUROVEA multifunctional complex”
Description:
The steel structure of the crown starts at the top floors (45.P) and extends up to the roof plane of the last floor to a height of 167.715 m. It consists of 12 columns of chamber cross-section placed around the perimeter of the building in the shape of an irregular triangle surrounded by three horizontal rings.
Location:
Bratislava
The period of execution of the works:
2022
20220914_131058_resized
20220912_111202_resized
20220914_131049_resized
FB_IMG_1663228801118
FB_IMG_1663228791849
FB_IMG_1663228779618
20220913_101810_resized
20220913_101311_resized
20221020_124842
20221020_124852
IMG-20221005-WA0007
DCIM100MEDIADJI_0005.JPG
DCIM100MEDIADJI_0011.JPG
DCIM100MEDIADJI_0007.JPG
20220930_092218
20220930_092231
20221007_103901
20220914_131058_resized 20220912_111202_resized 20220914_131049_resized FB_IMG_1663228801118 FB_IMG_1663228791849 FB_IMG_1663228779618 20220913_101810_resized 20220913_101311_resized 20221020_124842 20221020_124852 IMG-20221005-WA0007 DCIM100MEDIADJI_0005.JPG DCIM100MEDIADJI_0011.JPG DCIM100MEDIADJI_0007.JPG 20220930_092218 20220930_092231 20221007_103901