Bridge to the Island in Trenčín

Subject of the contract:
Reconstruction of the bridge.
The purpose of the reconstruction was to widen the road and add steel footbridges for pedestrians and cyclists. The steel construction of the footbridges also serves for the installation of engineering networks. The reconstruction consists of strengthening the load-bearing structure of the reinforced concrete girder bridge by means of external prestressing cables and the addition of additional shear reinforcement. Part of the solution was the alignment of permanent deflections, replacement of bearings, replacement of the road cover with waterproofing and drainage of the bridge by means of composite continuous curb drains.
Location:
Trenčín, SK
The period of execution of the works:
2015-2017
ostrov01
ostrov02
ostrov03
ostrov06
ostrov08
ostrov10
WP_20170215_09_44_46_Pro
WP_20170227_09_10_33_Pro
WP_20170504_15_22_52_Pro
WP_20170524_08_21_28_Pro
ostrov04
WP_20170117_14_17_54_Pro
WP_20160529_12_56_56_Pro
WP_20170120_15_53_24_Pro
WP_20160212_12_46_56_Pro
ostrov01 ostrov02 ostrov03 ostrov06 ostrov08 ostrov10 WP_20170215_09_44_46_Pro WP_20170227_09_10_33_Pro WP_20170504_15_22_52_Pro WP_20170524_08_21_28_Pro ostrov04 WP_20170117_14_17_54_Pro WP_20160529_12_56_56_Pro WP_20170120_15_53_24_Pro WP_20160212_12_46_56_Pro