Subject of the contract: |
Reconstruction of the bridge. The purpose of the reconstruction was to widen the road and add steel footbridges for pedestrians and cyclists. The steel construction of the footbridges also serves for the installation of engineering networks. The reconstruction consists of strengthening the load-bearing structure of the reinforced concrete girder bridge by means of external prestressing cables and the addition of additional shear reinforcement. Part of the solution was the alignment of permanent deflections, replacement of bearings, replacement of the road cover with waterproofing and drainage of the bridge by means of composite continuous curb drains. |
Location: |
Trenčín, SK |
The period of execution of the works: |
2015-2017 |