D11 1107 Headway Smiřice – Jaroměř

SO 240 Railway bridge over transfer I / 33 in 44.179 km of the Jaroměř – Dvůr Králové line

Subject of the contract:
Production and assembly of the steel structure of the bridge.
It is a permanent single-track bridge with a lower deck with a weight of steel structure of 55 tons. The load-bearing structure consists of beams reinforced with a lattice coupled to a bridge deck weighing 97 tonnes of steel structure. The total weight of the steel structure of the bridge is 152 tons with a length of 59,55 m.
Location:
Jaroměř, CZ
The period of execution of the works:
2018