Railway bridge on the line České Velenice-Plzeň

Subject of the contract:
Production and assembly of the steel structure of the bridge
Description:
The bridge is designed as a sequence of 3 simple arrays. The superstructures are all-steel all-welded in all spans with a lower bridge deck and a track bed gutter. In the outermost spans, these are parapet girders with a span of L=26 m and in the main span, Langer beams (arch braced beam) for a span of 69 m. The supporting structure is placed on a reinforced concrete monolithic substructure. The foundation is deep, using drilled large-diameter piles.
The total weight of the steel structure of the bridge: 619 tonnes
Bridging length: 121,00 m
Bridge length: 144,50 m
Location:
České Budějovice,  CZ
The period of execution of the works:
06/2020 – 2021
WP_20201121_11_41_00_Pro
WP_20201121_12_54_42_Pro
WP_20201121_15_49_29_Pro
WP_20201101_07_22_57_Pro
IMG-20201027-WA0004
IMG-20201027-WA0001
IMG-20201027-WA0002
WP_20200902_10_42_05_Pro
WP_20201102_16_34_30_Pro
1610612811607
IMG-20201203-WA0011
1607545555993
1610612811622
IMG-20210505-WA0003
1619499743496
1617254893348
IMG_20210723_121935
1626292192147
IMG_20210723_121837
WP_20201121_11_41_00_Pro WP_20201121_12_54_42_Pro WP_20201121_15_49_29_Pro WP_20201101_07_22_57_Pro IMG-20201027-WA0004 IMG-20201027-WA0001 IMG-20201027-WA0002 WP_20200902_10_42_05_Pro WP_20201102_16_34_30_Pro 1610612811607 IMG-20201203-WA0011 1607545555993 1610612811622 IMG-20210505-WA0003 1619499743496 1617254893348 IMG_20210723_121935 1626292192147 IMG_20210723_121837