Footbridge over the Morava river

including the access road in the Mikulčice-Kopčany archeological park

Subject of the contract:
Production and assembly of the steel structure of the bridge.
The bridge structure of the footbridge is designed as a subtle steel structure with a reinforced concrete composite bridge deck floor with a bridging length of 139 m a bridge length of 143,4 m and a load-bearing structure length of 140,8 m. The length of the arched pard of the steel structure is 91,3 m with a weight of 204 tons.
Location:
Mikulčice-Kopčany , CZ/SK
The period of execution of the works:
2018-2019
mikulcice01
mikulcice03
mikulcice04
mikulcice05
mikulcice06
mikulcice07
mikulcice08
WP_20190314_10_56_19_Pro
WP_20190725_16_53_38_Pro
WP_20191014_10_44_44_Pro
IMG_0097
20190502_130527
WP_20190625_11_30_07_Pro
WP_20190417_11_22_22_Pro
WP_20190614_13_54_41_Pro
WP_20190905_14_00_47_Pro
WP_20190428_08_18_02_Pro
mikulcice01 mikulcice03 mikulcice04 mikulcice05 mikulcice06 mikulcice07 mikulcice08 WP_20190314_10_56_19_Pro WP_20190725_16_53_38_Pro WP_20191014_10_44_44_Pro IMG_0097 20190502_130527 WP_20190625_11_30_07_Pro WP_20190417_11_22_22_Pro WP_20190614_13_54_41_Pro WP_20190905_14_00_47_Pro WP_20190428_08_18_02_Pro