including the access road in the Mikulčice-Kopčany archeological park
Subject of the contract: |
Production and assembly of the steel structure of the bridge. The bridge structure of the footbridge is designed as a subtle steel structure with a reinforced concrete composite bridge deck floor with a bridging length of 139 m a bridge length of 143,4 m and a load-bearing structure length of 140,8 m. The length of the arched pard of the steel structure is 91,3 m with a weight of 204 tons. |
Location: |
Mikulčice-Kopčany , CZ/SK |
The period of execution of the works: |
2018-2019 |