Subject of the contract: |
Production and assembly of the steel structure. The roofing of the grandstands of the national football stadium is characteristically divided according to the orientation of the world parties into north, east, west and south grandstands. The steel structure of the south and east grandstands is structurally identical. The construction of the north grandstand is installed lower so as not to cause shading of residential buildings. The structure of the west tribune is mounted on the supporting reinforced concrete structure of the roof. The basic static scheme for all grandstands is a console. The layout of the consoles is different for each type of grandstand. The brackets are designed as lattice systems anchored to reinforced concrete structures. Weight of steel structure 1.650 tons. |
Location: |
Bratislava, SK |
The period of execution of the works: |
2018 – 2019 |