Railway bridge over road III/018149 and the stream Rakovec

Subject of the contract:
Production and assembly of the steel structure of the railway bridge
Description:
The bridge is 6-pole, with an upper deck, with a continuous track bed. There is a separate supporting structure under each track. The load-bearing structures are separated from each other by a covered expansion joint. The load-bearing structures are composite, reinforced concrete. The supporting structure is mounted via pot bearings on supports. Supports are reinforced concrete monolithic and are based on deep foundations /large-diameter drilled piles/.
Weight of steel structure: 1.150 tonnes
Length of steel structure: 193,5 m
Location:
Svit-Štrba, SK
The period of the execution of the works:
2021
WP_20210504_10_23_37_Pro
IMG_20210610_135649
IMG_20210520_135642
IMG_20210520_135707
IMG_20210531_081451
IMG_20210528_124507
IMG_20210610_135708
1627280071739
1627280531636
IMG_20210903_080429
IMG_20210903_080412
IMG_20211006_145211
OS 6 a 7
Opora 1,2,3,
IMG_20211006_114631
IMG_20211006_145326
IMG-20211221-WA0015
IMG-20211221-WA0022
IMG-20211221-WA0016
IMG-20211221-WA0020
IMG-20211221-WA0019
IMG-20211221-WA0000
IMG-20220208-WA0000
IMG-20211221-WA0008
WP_20210504_10_23_37_Pro IMG_20210610_135649 IMG_20210520_135642 IMG_20210520_135707 IMG_20210531_081451 IMG_20210528_124507 IMG_20210610_135708 1627280071739 1627280531636 IMG_20210903_080429 IMG_20210903_080412 IMG_20211006_145211 OS 6 a 7 Opora 1,2,3, IMG_20211006_114631 IMG_20211006_145326 IMG-20211221-WA0015 IMG-20211221-WA0022 IMG-20211221-WA0016 IMG-20211221-WA0020 IMG-20211221-WA0019 IMG-20211221-WA0000 IMG-20220208-WA0000 IMG-20211221-WA0008